• ONGC Start-up
  • Right to Information
  • ONGC Energy Centre
  • Public Grievances
  • Lodge Complaint
  • Visitor Management System

ONGC Road Show

Procurement of 23 Logging Units & Downhole Tools
and Lifetime Repair and Maintenance Contract


 

Houston, USA (27th July 2017)

Calgary, Canada (31st July 2017)

London, UK (8th Aug 2017)

Bremen, Germany (11th Aug 2017)

Logging Services

OIL & NATURAL GAS CORPORATION LTD INDIA’S PRIDE

Requirement of Logging Units with down-hole tools/ accessories with lifetime (10 Years) Repair and Maintenance Contract

a. Break-up of type of 23 Logging Units -

  • OH Units        : 07 for Onland Operations (Truck mounted)
  • OH Units        : 04 for Offshore Operations (Skid Units)
  • CH-PL Units  : 12 for Onland Operations (Truck mounted)

b. Requirement as per geo-graphic distribution -

Geographical Region
in India
Geographical Location Number of Open-hole Logging Units Number of Cased-hole/ Production Logging Units
Western Onshore Ahmedabad 1 2
Ankleshwar 1 2
Mehsana 2 2
Western Offshore Mumbai 4
(Offshore Skid Units)
-
North East Onshore Nazira - 1
Jorhat - 1
Agartala 1 1
Bokaro 1 1
Southern Onshore Rajahmundry - 1
Karaikal 1 1
  Total 11 12

List of Downhole Tools/ Accessories

a. Open-hole Tools and Accessories -

  1. Down-hole Telemetry
  2. Auxiliary Down-hole Tool
  3. High Resolution Latero Log Array Tool
  4. High Resolution Array Induction Tool
  5. RXO Tool
  6. Spectral Gamma Ray Tool
  7. Compensated Spectral Density Tool
  8. Compensated Neutron Porosity Tool
  9. Digital Bore-hole compensated Full Wave Acoustic 
    Tool with facility to record CBL/ VDL/CCL
  10. Side Wall Coring Tool with Shooting Gamma Ray
  11. Caliper Tool
  12. Full Bore Resistivity Imager
  13. Bore-hole deviation survey tool
  14. Circumferential acoustic scanning tool
  15. Shear Stonley Sonic Imager
  16. Segmented/ Radial type CBL-VDL with CCL & GR
  17. Fishing equipment of down-hole tools
  18. Rig up accessories

b. Cased-hole/ Production Logging Tools/ Accessories

  1. Well Head Pressure Control Equipment 5000 PSI
  2. Well Head Pressure Control Equipment 10000 PSI
  3. PL Stack with two sets of Telemetry Sub of size not exceeding 1-7/16” / 1-11/16”
    1. Fluid Density (Radio-active/ acoustic type)
    2. Gamma Ray
    3. Quartz Pressure Gauge
    4. Temperature
    5. Hydro Tool (Single Sensor capacitance type)
    6. Continuous Flow-meter
    7. Full Bore Flow-meter
    8. CCL Tool compatible with above PLT Stack
  4. 1-11/16” or less Slim-hole GR/N/CCL Tool
  5. 1-11/16” or less Slim-hole GR/N/CCL Tool (HPHT)
  6. Shooting CCL 3 ¼” OD
  7. Shooting CCL 1-11/16” OD/ 1-7/16” OD
  8. Shooting Slim Hole GR
  9. 3-5/8” to 3-1/4” CBL-VDL with CCL, GR, N
  10. 3-5/8” to 3-1/4” Segmented/ radial CBL-VDL with CCL, GR
  11. 3-5/8” to 3-1/4” Segmented/ radial CBL-VDL with CCL, GR – HPHT
  12. Bridge Plug Setting Tool
  13. Bridge Plug Setting Tool (HPHT)
  14. Junk Basket
  15. Multi Finger Imaging Tool
  16. Magnetic Thickness Tool
  17. Free Point Indicator Tool
  18. Fishing equipment of Down-hole Tools
  19. Rig up accessories

c. Repair & Maintenance Contract

  • ONGC also to hire 10 years R&M services from OES for all 23 units, tools and equipment along with award of procurement of units.
  • R & M contract will start from the next day of signing of installation/ commissioning MOU at respective locations.

Note: For details about number of downhole tools/ accessories, Specifications and contract conditions, please refer soft copies provided separately. In case of any clarification, please mail to : kumar_vinod7@ongc.co.in

Please drop in your details for further communication:

Name :
Phone No :
Email Id :
Address :
Company :